Bar chairs, laps and ties before a pour

What a slab pre-pour inspection checks in the steel, using findings from nearby Cranbourne East.

Pakenham 3810 · 2026-05-26

In short: A slab's strength depends on steel sitting in the right place inside the concrete. Chairs, laps and ties are how it gets there.

Steel has to be held up

Mesh and bars sit on chairs so the concrete can flow underneath and cover them. Too few chairs and the steel gets pushed down as people walk on it during the pour.

What we recorded

On a slab in Cranbourne East, close to Pakenham, edge beam steel had too few chairs and some sprayed on supports where proper ones were needed. Mesh between the pods also needed more support.

Laps and ties

Where mesh sheets or bars meet they must overlap by a set length and be tied. Untied steel at corners and crossings moves when the concrete is vibrated.

The vapour barrier

The same slab had the barrier stopping short of ground level in the edge beam. It is meant to run continuously under the slab and down the beams.

Timing

All of this is checked the day before the pour. The next day it is inside the concrete for good.

Written by our local inspection team from work carried out in Pakenham. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Pakenham

All guides →

Book a building inspection in Pakenham

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Pakenham owners ask about this

Is a slab inspection worth it if the surveyor also inspects?

Yes. A second check costs little against a slab you cannot inspect again.

How far ahead should I call you?

A day is normally fine once the pour date is known.

What happens if items are found?

Most are fixed by the steel fixer within an hour or two.

Which standard applies?

AS 2870 and the engineer's slab design for your lot.