Waterproofing inspections in Pakenham

A look at the membrane before tiles hide it, when a fault is still a quick fix.

  • Membrane on and cured, tiler not yet booked
  • About 1 hour on site
  • Report within 24 hours
Request a quoteLeave your details and an inspector will ring you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane on and cured, tiler not yet booked
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Pakenham waterproofing inspection

  • Membrane clear of the temporary outlet plug
  • Puddle flange and outlet detail
  • Water stop angle at each doorway
  • Water stop joined to the wall flashing
  • Upturns behind door jambs and architraves
  • Wall to floor junctions bandaged
  • Membrane height in the shower
  • Coverage across the whole wet floor
  • Penetrations through the membrane sealed
  • Membrane protected from other trades
  • Bath and fittings covered during work
  • Areas hidden by vanities noted
Why it matters here

Waterproofing inspections on Pakenham builds

The waterproofing items we record are mostly at the edges: a membrane painted over the temporary plug in the shower outlet, water stops at doorways that do not tie into the wall, and fresh membrane left unprotected while other trades walk across it.

What we find at this stage in Pakenham

  • Membrane painted over the outlet's temporary plug
  • Water stop angles not joined to the wall flashing
  • Door jambs sitting over the threshold without membrane behind
  • Fresh membrane walked on and damaged
  • Baths installed with no protection
Installed bath left without a protective cover during construction, found during a waterproofing inspection in Pakenham
Installed bath left without a protective cover during construction
Vanity fitted after waterproofing, hiding the membrane behind it, found during a fixing inspection in Pakenham
Vanity fitted after waterproofing, hiding the membrane behind it
Sample findings

Sample defects found during our waterproofing inspections in Pakenham

Annotated findings from Waterproofing inspections.

Membrane painted over the temporary plug in the shower outlet, so it will tear, found during a waterproofing inspection in Pakenham
Membrane painted over the temporary plug in the shower outlet, so it will tear
Water stop angle at the door threshold not tied into the wall flashing, found during a waterproofing inspection in Pakenham
Water stop angle at the door threshold not tied into the wall flashing
Fresh membrane left uncovered while trades walk across the floor, found during a waterproofing inspection in Pakenham
Fresh membrane left uncovered while trades walk across the floor
Door jamb sitting over the threshold without membrane carried behind it, found during a waterproofing inspection in Pakenham
Door jamb sitting over the threshold without membrane carried behind it

The other stages of a Pakenham build

  1. Bored piers inspection in Pakenham1Bored piersHoles drilled and cages set, concrete not yet ordered
  2. Slab pre-pour inspection in Pakenham2Slab pre-pourSteel tied and formwork up, the day before concrete
  3. Frame inspection in Pakenham3FrameWalls standing and trusses on, before wrap and windows close it in
  4. Lock-up (pre-plaster) inspection in Pakenham4Lock-up (pre-plaster)Roof, windows, external doors and cladding on, before plaster
  5. Fixing inspection in Pakenham5FixingLinings, joinery and doors in, painters not yet started
  6. Pre-handover (PCI) inspection in Pakenham7Pre-handover (PCI)About a week before the handover meeting

All construction stage inspections in Pakenham →

Guides

Construction stage guides for Pakenham

All guides →

Book a waterproofing inspection in Pakenham

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Pakenham: common questions

What is wrong with membrane over the plug?

When the plug is pulled out at fit off, the membrane tears with it and leaves the outlet unsealed under the tiles.

What does a water stop do?

It stops water on the bathroom floor travelling under the door into the next room.

Why protect the membrane?

Boots, ladders and dropped tools puncture it, and a puncture under tiles is a leak.

Is this the same as the fixing stage?

No. Waterproofing is checked before tiling. Fixing comes later, once linings, doors and joinery are in.

How long does a waterproofing visit take?

Roughly an hour for two bathrooms and a laundry.

What standard applies?

AS 3740 for waterproofing of domestic wet areas and the NCC.